Reliable Gate Valve with 10-45 Days Delivery Time Guarantee

Product Details
Customization: Available
Media: Water
Temperature: Ordinary Temperature
Still deciding? Get samples of $ !
Request Sample
Gold Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
OEM Services
The supplier provides OEM services for popular brands
Private Mold
The supplier has private mold
QA/QC Inspectors
The supplier has 1 QA and QC inspection staff
to see all verified strength labels (14)
  • Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
  • Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
  • Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
  • Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
  • Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
  • Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Company Profile
  • Our Advantages
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
Z41T-16Q
Type
Valve Stem Rising and Falling Type (Exposed Stem)
Material
Ductile Iron and Copper
Connection Form
Flange
Pressure
Ordinary Pressure
Actuator
Manual
Seal Surface
Wedge Gate Valve
Thread Position of Valve Rod
Inside Gate Valve
Usage
Regulation, Safety, Drain, Flow Control
Standard
ANSI
Application
Industrial Usage, Water Industrial Usage
Pressure Test
Jb/T9092 - 1999
Delivery Time
10 - 45 Days(Depending on The Quantity)
Design and Manufacture
Cj/T216 - 2005
Transport Package
Wooden Crate
Specification
DN40-DN600
Trademark
ANGGUANG
Origin
China
HS Code
84818030
Production Capacity
500pieces/Week

Product Description

Product Description

 

Product Name: Reliable Gate Valve with 10-45 Days Delivery Time Guarantee

Category: Gate Valve

Material: Ductile Iron

Color: Red

Features: Rising Stem, Copper Stem and Core

Upgrade your industrial equipment to new heights with our superior Reliable Gate Valve. Crafted from robust ductile iron, this valve is engineered to endure intense pressure, assuring you of consistent performance. Its striking red hue not only enhances your machinery's aesthetics but also signifies reliability and strength. The innovative rising stem feature ensures effortless operation, while the copper stem and core offer remarkable conductivity and resistance to corrosion, guaranteeing longevity. Whether for industrial upgrades or cross-border e-commerce, this gate valve stands as a premier choice for efficiency and durability.

Detailed Photos

 

Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
Reliable Gate Valve with 10-45 Days Delivery Time GuaranteeReliable Gate Valve with 10-45 Days Delivery Time GuaranteeReliable Gate Valve with 10-45 Days Delivery Time Guarantee
Product Parameters
Technical Parameter
Details
Rotation Method
Handwheel
Nominal Diameter
DN40 - DN800
Pressure Test
JB/T9092 - 1999
Structural Length
GB/T12221 - 2005
Pressure Rating
0.6MPa - 1.6MPa
Applicable Media
Water, Steam, Gas, Oil Products, etc.
Design and Manufacture
CJ/T216 - 2005
Applicable Temperature
0ºC - 80ºC
Flange Connection
GB/T17241.6 - 200 (The standard number here seems incomplete. Please confirm according to the actual situation)
Company Profile

 

Reliable Gate Valve with 10-45 Days Delivery Time GuaranteeReliable Gate Valve with 10-45 Days Delivery Time Guarantee
Our Advantages

As a direct-selling store closely linked to our factory, we exercise precise control over the entire production process. From meticulous material selection to advanced manufacturing techniques, our vigilant oversight ensures products of exceptional quality at prices that defy the market norm. This streamlined factory-direct sales approach eradicates unnecessary middlemen, enabling us to deliver genuine savings directly to you. Bypass traditional mark-ups and indulge in a shopping experience that harmonizes outstanding quality with unbeatable affordability.

Reliable Gate Valve with 10-45 Days Delivery Time GuaranteeReliable Gate Valve with 10-45 Days Delivery Time Guarantee
Certifications

A significant number of our products boast internationally acclaimed certification credentials. For instance, our fire hoses are CE certified, while our gate valves, butterfly valves, and sprinkler heads carry both UL and FM certifications. These endorsements serve as a testament to our commitment to safety and quality.

Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
Packaging & Shipping

 

Reliable Gate Valve with 10-45 Days Delivery Time Guarantee
FAQ

Q1: How many factories do you operate, and what products can you supply?

A: We own multiple specialized factories producing fire protection equipment, including fire hoses, valves, hydrants, hose reels, and related accessories. Our integrated manufacturing system allows one-stop sourcing with consistent quality control across all product lines.

Q2: Do your products meet international certifications?
A: Yes. Our factories hold ISO 9001 certification, and products comply with UL, FM, CE, EN, and other regional standards. We provide full certification documentation and support third-party inspections.

Q3: Can you handle customized specifications or OEM orders?
A: Absolutely. We specialize in customized solutions:
• Adjusting materials (e.g. rubber/PVC hoses)
• Dimensional modifications
• Branding/packaging requirements
• Technical parameter adjustments
Dedicated R&D and QC teams ensure tailored solutions without compromising standards.

Q4: What are your minimum order quantities (MOQs)?
A: We offer flexible MOQs to suit different buyers:
• Standard products: 1x20' FCL (mixable within same category)
• Custom/OEM orders: Negotiable based on design complexity
Contact us for small trial orders in select product lines.

Q5: How do you ensure reliable logistics and delivery?
A: Our advantages:
Good:15+ years of export experience
Good:FOB/CIF terms with trusted forwarders
Good:Consolidated container loading across factories
Good:Average 10-45 days lead time (custom orders slightly longer)
Real-time shipment tracking and documentation support provided.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now